Jr./Sr. High School

This project was fully funded and completed.  Thank you for everyone’s generous donations!

About the Project

In September 2011, the residents of Brandon, Rowley and Independence passed a bond vote with nearly 70% approval to construct a new $27.5 M Jr./Sr. High School Facility. The Mustang Foundation led the capital campaign for the construction of the new Independence Jr./Sr. High School. The structure is finished and is beautiful. We continue to take donation to offset any costs associated with the new facility.

Features:

  • 170,000 sq. ft. facility located right off 20th Ave.
  • Individual classrooms for all full-time instructors
  • Specially designed Junior High and Senior High wings with a Central Tech / Shared wing
  • Whiteboards, projectors, mimeo devices and other technology features to maximize teaching tools
  • 2,500 sq. ft. library / media center
  • 700 seat auditorium with a magnificent stage and acoustics / sound system
  • 17,500 sq. ft. gymnasium with a press box / suites
  • Gymnasium will hold a capacity of 2000 attendees with seating on all four sides
  • 3600 sq. ft. weight room facility with high-end weight training equipment
  • 5500 sq. ft. wresting room
  • 4 Locker Rooms which also serve as  FEMA Safe Room (Severe Weather Storm Shelter)
  • One main entrance with lock-down capabilities and secure emergency exits
  • Efficient “hybrid HVAC system” with air conditioning
  • Skylight system spanning entire “main street” area of school for natural daylight
  • Large parking lot in front of building with over 400 parking stalls

Making a Donation

order-iconClick here to download a donation form for this project.

Construction Progress of the new Jr./Sr. High School

Virtual Tour of the new Jr./Sr. High School